+16 16 0
Published 7 years ago by kxh with 0 Comments

Weaving the Bridge at Q’eswachaka

Every year, local communities on either side of the Apurimac River Canyon use traditional Inka engineering techniques to rebuild the Q'eswachaka Bridge. The old bridge is taken down and the new bridge is built in only three days. The bridge has been rebuilt in this same location continually since the time of the Inka.

 

Join the Discussion

  • Auto Tier
  • All
  • 1
  • 2
  • 3
Post Comment

Here are some other snaps you may like...