Renewable Energy Is Much Faster To Install & More Scalable Than Nuclear Power
One major advantage renewable energy has over fossil fuels and nuclear power is that it can typically be installed much faster. Nuclear power plants can require 5–15 years to complete and some have taken 20 or more. Constructing a new coal power plant can takes 4 years or more. (Another point about coal plants — if renewable energy costs continue to decline, some new coal power plants may be shut down soon after opening or not opened at all, and almost certainly will not reach their full operational lifespans.
Continue Reading https://cleantechnica.com
Join the Discussion